5 Tuj 220v 50hz Dej Txias Cua Txias

5 Tuj 220v 50hz Dej Txias Cua Txias

Tus kheej-Contained Aircon Industrial 5ton marine AC Packaged Central Air Conditioner
Xa kev nug
Tsham tam sim no

 

5 tuj 220v 50hz dej txias cua txias

 SeaWater Cooled Packaged Unit



Model No.


wb 060
Unit  performance Cooling capacity
BTU60000

Air flow
m3/h2800

External static pressure
Pa200

Noise level
dB (A)52

Fais fab mov

400V / 3PH / 50Hz
Refrigerating  systemCompressor Hom
Hermetic scroll type


hom
Panasonic


Hwj chimkW4

Condenser  Hom
Nickel dawb tooj liab yeeb nkab ntxiv rau stainless hlau kawg npog


Water flow         m3/h3.8


Water pressure drop mH2 ua25


Connecting pipe    mm32

Evaporator Hom
Copper tube with aluminium fin 

Refrigerant Hom
R404A


Volume control
expansion valve
Air supply  systemBlower Hom
Low-noise centrifugal 


Driving method 
ncaj qha tsav

Motor Hwj chimkW0.75
Unit Dimensions 
LWHmm10005501600

300KW water ac (8)

300KW water ac (9)

浩特普尔--详情源文1件_03
浩特普尔--详情源文1件_02

浩特普尔--详情源文1件_04

浩特普尔--详情源文1件_05

浩特普尔--详情源文1件_06

5.生产流程

6.合作客户

7.认证证书

8.支付与物流信息

Carrie Mak 名片

9.FAQ

 5 Ton 220v 50hz Water Cooled Air Conditioner Debugging of Air Conditioning System 

When the installation of air conditioning system, water system, air duct system, refrigerating system and electrical system is finished, then you can debug the air conditioning system. 

5 Ton 220v 50hz Water Cooled Air Conditioner Preparation 

Prepare the necessary tools and instruments, such as the refrigerant pressure gauge (composite gauge), anemometer, noise meter, digital thermometer, clamp Meter, multimeter, etc.. When water system pressure test has finished, the pipe should be cleaned repeatedly several times. Check water system, air conditioner, air duct system and electrical system thoroughly to see whether they meet the design requirements.



Cim npe nrov: 5 tuj 220v 50hz dej txias cua txias, Tuam Tshoj, manufacturers, customized, quotation, luv nqi, ua nyob rau hauv Suav teb